«146 FERC ¶ 61,020 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Cheryl A. LaFleur, Acting Chairman; Philip D. ...»

-- [ Page 1 ] --

146 FERC 61,020

UNITED STATES OF AMERICA

FEDERAL ENERGY REGULATORY COMMISSION

Before Commissioners: Cheryl A. LaFleur, Acting Chairman;

Philip D. Moeller, John R. Norris,

and Tony Clark.

Midcontinent Independent System Operator, Inc. Docket Nos. ER14-295-000

ER13-1631-001

ORDER ACCEPTING TARIFF REVISIONS AND GRANTING LIMITED

EXTENSION OF WAIVERS

(Issued January 14, 2014)

1. In this order, the Commission accepts Midcontinent Independent System Operator, Inc.’s (MISO) proposed modifications to the provisions of its Open Access Transmission, Energy and Operating Reserve Markets Tariff (Tariff) that govern the processing of point-to-point transmission service requests and the treatment of unreserved use, effective January 15, 2014, as explained below.

2. Also in this order, the Commission grants MISO’s request for a limited extension of waivers of certain aspects of its Tariff provisions governing unreserved use penalties, 1 determination of reservation priority for point-to-point transmission service, 2 and the reservation priority for exercise of the right of first refusal (ROFR) for point-to-point transmission service 3 from November 19, 2013 until January 15, 2014, the requested effective date of the proposed Tariff revisions, as explained below.

I. Background

3. On January 2, 2013, as amended on February 2, 2013, February 8, 2013, and February 27, 2013, in Docket No. ER13-692-000, MISO proposed several revisions to its Tariff in conjunction with its plans to replace its Open Access Same-Time Information Tariff Sections 13.7, 14.5, 27A.1.6, 27A.2.4, 30.4, and 37.2.

Tariff Sections 13.2, 14.2, 27A.1.2, 27A.2.2, and 27A.2.6.

Tariff Sections 13.2 and 27A.1.2.

Docket Nos. ER14-295-000 and ER13-1631-001 -2System (OASIS). 4 MISO stated that the proposed revisions improved the existing OASIS practices and satisfied the “consistent with or superior to” standard that the Commission reaffirmed in Order No. 890. 5 MISO Transmission Owners filed comments opposing several of the proposed revisions. By order issued on April 26, 2013, the Commission accepted certain of the proposed revisions, but rejected proposed Tariff provisions relating to penalties for unreserved use, reservation priority for point-to-point transmission service, and reservation priority for exercising a ROFR. The Commission found that MISO had not satisfied the “consistent with or superior to” standard for the revisions related to reservation priority for point-to-point transmission service and reservation priority for exercising a ROFR provisions. The Commission also rejected revisions relating to penalties for unreserved use, stating that MISO’s proposal only addressed how unreserved use penalties will be imposed on Interchange Schedules but not on non-Interchange Schedules. Accordingly, the Commission directed MISO to submit a compliance filing removing these rejected Tariff revisions. 6

4. On June 4, 2013, as amended on August 8, 2013, in compliance with the April 26 Order, MISO submitted revisions to its Tariff in order to re-file the previously effective See Midwest Indep. Transmission Sys. Operator, Inc., 143 FERC 61,070, at P 2 (2013) (April 26 Order) (noting MISO’s plans to replace its OASIS). Prior to its filing in Docket No. ER13-692-000, MISO requested, and the Commission granted, in Docket No. ER11-2923-000, a limited, one-time waiver of certain Commission regulations and Tariff provisions until April 30, 2012 (for waiver of requirements of Attachment O and 18 C.F.R. § 38.2(a)(2) regarding posting data to the security template in the OASIS) and December 31, 2012 (for waiver of Tariff sections 13.2 and 14.2). Midwest Indep.

Transmission Sys. Operator, Inc., 139 FERC 61,062 (2012). MISO requested that waiver in order to allow it to upgrade its OASIS to comply with Order No. 676-E, which set forth revised standards adopted by the Wholesale Electric Quadrant of the North American Energy Standards Board and directed public utilities to either incorporate them into their jurisdictional tariffs or seek a waiver from the Commission. See Standards for Business Practices and Communication Protocol for Public Utilities, Order No. 676-E, FERC Stats. & Regs. 31,299 (2009).

See Preventing Undue Discrimination and Preference in Transmission Service, Order No. 890, FERC Stats. & Regs. 31,241, order on reh'g, Order No. 890-A, FERC Stats. & Regs. 31,261 (2007), order on reh'g and clarification, Order No. 890-B, 123 FERC 61,299 (2008), order on reh'g, Order No. 890-C, 126 FERC 61,228 (2009), order on clarification, Order No. 890-D, 129 FERC 61,126 (2009).

The affected Tariff provisions were sections 13.2, 13.7, 14.2, 14.5, 27A.1.2, 27A.1.6, 27A.2.2, 27A.2.4, 27A.2.6, 30.4, and 37.2.

Docket Nos. ER14-295-000 and ER13-1631-001 -3versions of the provisions rejected in the April 26 Order. On the same day, as amended on July 22, 2013, in Docket No. ER13-1631-000, MISO filed a request for limited waivers of certain aspects of the provisions of its Tariff governing unreserved use penalties, determination of reservation priority for point-to-point transmission service, and the reservation priority for exercise of the ROFR for point-to-point transmission service. MISO stated that the requested waivers would allow MISO time to evaluate, develop, test and implement the process, software and Tariff language revisions necessary to respond to the April 26 Order, to allow for appropriate training and transition assistance, and to ensure that any downstream process impacts are identified and understood.





5. By order issued on October 25, 2013, the Commission accepted MISO’s compliance filing which, as indicated, restored the previously effective versions of the Tariff provisions rejected in the April 26 Order. 7 The October 25 Order also granted MISO’s request for limited waivers of the restored Tariff provisions from April 15, 2013 until November 19, 2013.

II. Docket No. ER14-295-000

6. On November 1, 2013, MISO filed proposed revisions to the Tariff to address the unreserved use penalty and reservation priority issues associated with its new OASIS platform as developed by MISO and vetted with MISO’s transmission owners (November 1 Filing). MISO requests an effective date of January 15, 2014 for the proposed Tariff changes.

7. MISO states that in undertaking efforts to identify unreserved use, it was committed to developing an unreserved use tracking mechanism for internal transmission service (i.e., tracking unreserved use on power flows internal to MISO 8) that was efficient and cost effective. But, according to MISO, a challenge for tracking internal network service was that MISO does not currently require the submission of schedules for internal transmission service, which would be the most direct, efficient method of identification of unreserved use internally. Thus, it had to explore alternative methods to identify internal unreserved use. MISO states that it considered using metering data to identify internal unreserved use. However, applying that approach across the entire MISO footprint would require MISO to collect and analyze metering data for all internal meter points for all time points during each month. According to MISO, the implementation of such a process would likely cost MISO and its transmission owners Midcontinent Indep. Sys. Operator, Inc., 145 FERC 61,070 (2013) (October 25 Order).

November 1 Filing, Transmittal Letter at 3.

Docket Nos. ER14-295-000 and ER13-1631-001 -4more than might be received from penalties assessed as a result of an occasional finding.

In short, states MISO, the costs associated with implementing a daily metering assessment for purposes of identifying internal unreserved use would need to correlate to substantial benefits to justify the significant resources and, analyses performed by MISO (as provided in in Attachments C and D of the November 1 Filing) do not support such correlation. 9

8. MISO states that it and its transmission owners discussed the potential options for tracking internal unreserved use and determined that future, planned Reliability Standards that require the scheduling of all internal point-to-point transmission service would be the most appropriate method to facilitate the tracking and identification of internal unreserved use. More specifically, MISO identified that North American Electric Reliability Corporation (NERC) Reliability Standard INT-011-1, Intra-Balancing Authority Transaction Identification, requires mandatory tagging of all intra-Balancing Authority transfers that use point-to-point transmission service. MISO determined that the most efficient way to track internal unreserved use was to do so in conjunction with NERC’s intra-Balancing Authority tagging requirement, which would track unreserved use of internal point-to-point service on the same basis as is done for Interchange Transactions. MISO states that it is committed to doing so once INT-011-1 is effective. 10

9. To address the identification and penalization of unreserved use of point-to-point transmission service on MISO’s transmission system, MISO proposes in the November 1 Filing an interim sampling approach for monitoring unreserved use associated with internal point-to-point transmission service, until the implementation of INT-11-1 that requires mandatory tagging of all intra-Balancing Authority transfers that use point-topoint transmission service. 11 MISO states that it will detail the sampling methodology and its process for review in its Business Practice Manual 013 – Module B – Transmission Service. 12 MISO states that as it gains experience with the sampling methodology, it will adjust its sample size as necessary to better ensure that unreserved uses internal to its system are identified. With regard to unreserved use for internal network transmission service, MISO states that given the aforementioned challenges it had identified in its analyses it presents in the November 1 Filing, it proposes to remove all provisions related to the tracking of and administration of penalties for such internal Id. at 4 (citing Attachment C (MISO’s confidential transmission revenue assessment) and Attachment D (MISO’s confidential unreserved use cost analysis)).

Id. at 4-5.

Id. at 5.

Id.

Docket Nos. ER14-295-000 and ER13-1631-001 -5unreserved use. MISO proposes to retain the provisions related to tracking and administration of penalties for unreserved use as it relates to resources that are not physically connected to the MISO Transmission System, as these uses are currently tracked through Interchange Schedules. MISO states it has attempted to balance the Commission’s objectives regarding assessment of operation penalties as set forth in Order No. 890, in crafting its proposed final and interim solutions.

10. To address reservation priority for competing point-to-point transmission service requests, MISO proposes to eliminate price as the primary tiebreaking factor for competing transmission service requests, and to continue to prioritize competing transmission service requests based on the time that competing requests are received by MISO. 13 Given that MISO’s overall transmission service rate calculation is comprised of several factors that are determined after or at the time of service, MISO states that eliminating price as a tiebreaker will allow MISO to operate its transmission systems in an orderly and non-discriminatory manner.

11. To address reservation priority for exercising a ROFR when a longer duration point-to-point transmission service request preempts multiple shorter duration reservations, MISO proposes to eliminate duration and price as tiebreakers and to continue to prioritize the exercise of ROFRs by time of response. 14 MISO states that its OASIS is not configured to support duration-based bidding by reservation holders and to do so would expose market participants to complexities that introduce unnecessary risk to their defense of confirmed transmission service rights while also potentially providing an advantage to transmission customers with more resources. MISO further states that it proposes to remove price as a tiebreaker for ROFR for the same reasons as it proposes to remove price as a tiebreaker for reservation priority.

A. Notice of Filing and Responsive Pleadings

12. Notice of the November 1 Filing was published in the Federal Register, 78 Fed.

Reg. 68,050 (2013), with motions to intervene and protests due on or before November 22, 2013. Timely motions to intervene were filed by NRG Companies, 15 Wisconsin Electric Power Company and American Municipal Power, Inc.

Id.

Id. at 9.

NRG Companies are Louisiana Generating LLC, NRG Power Marketing LLC, GenOn Energy Management, LLC, Bayou Cove Peaking Power LLC, Big Cajun I Peaking Power LLC, NRG Sterlington Power LLC, Cottonwood Energy Company LP and NRG Wholesale Generation LP.

Docket Nos. ER14-295-000 and ER13-1631-001 -6A timely motion to intervene and comments were filed by MISO Transmission Owners. 16 MISO Transmission Owners do not oppose the proposed Tariff revisions.

They state that MISO collaborated with them in developing the proposed Tariff changes, and they state that the proposed changes are a reasonable solution to better align MISO’s Tariff with the limitations and functionality of the OASIS platform and market systems. 17

–  –  –

14. Pursuant to Rule 214 of the Commission’s Rules of Practice and Procedure, 18 C.F.R. § 385.214 (2013), the timely, unopposed motions to intervene serve to make the entities that filed them parties to this proceeding.

MISO Transmission Owners, for purposes of this filing, consist of: Ameren Services Company, as agent for Union Electric Company d/b/a Ameren Missouri, Ameren Illinois Company d/b/a Ameren Illinois and Ameren Transmission Company of Illinois; American Transmission Company LLC; Big Rivers Electric Corporation; Central Minnesota Municipal Power Agency; City Water, Light & Power (Springfield, IL);

Dairyland Power Cooperative; Duke Energy Corporation for Duke Energy Indiana, Inc.;

Entergy Arkansas, Inc.; Entergy Louisiana, LLC; Entergy Gulf States Louisiana, L.L.C.;



Pages:   || 2 |


Similar works:

«Miss Yourlovin Ann Elizabeth Pfau CHAPTER 3 Fraternization and the Uncensored Occupation Less than a week after American troops first set foot on German soil, reports of 1 soldiers fraternizing with German civilians had already reached the United States. Associated Press and United Press correspondents filed stories about friendly German civilians who welcomed the invaders. The New York Times printed both articles on 16 September and on the following day published a photograph of a smiling...»

«THE IDENTITY OF THE “I”: ROMANS 7:7-25 AND THE DOCTRINE OF SANCTIFICATION _ A Paper Presented to Dr. Daniel B. Wallace Dallas Theological Seminary _ In Partial Fulfillment of the Requirements for the Course NT105 Exegesis of Romans _ by Kyle R. Hughes November 2011 Box #531 THE IDENTITY OF THE “I”: ROMANS 7:7-25 AND THE DOCTRINE OF SANCTIFICATION Rom 7:7-25 are central verses for Paul’s doctrine of sanctification, but they are full of exegetical difficulties, particularly insofar as...»

«UNITED STATES INTERNATIONAL TRADE COMMISSION Washington, DC 20436 MEMORANDUM ON PROPOSED TARIFF LEGISLATION of the 108th Congress 1 [Date approved: April 7, 2004]2 Bill No. and sponsor: S. 1722, Sen. Santorum. Proponent name, location: Sony Electronics, Inc., Mount Pleasant, PA (Contact: Christina Tellalian, Sony U.S., Wash. DC, Tel. (202) 429-3653). Other bills on product (108th Congress only): S. 1794, HR. 3399. Nature of bill: Temporary duty suspension through December 31, 2006. Retroactive...»

«The causatives in Sun Hongkai’s Anong: language death and rapid restructuring Graham Thurgood California State University Chico Introduction. The Anong people, numbering approximately 6500, mainly live in Fugong County in the Nujiang Lisu Autonomous Prefecture of Yunnan Province (roughly 98.7°E and 27.1°N) on the tablelands on both sides of the Nujiang River. To the west is Myanmar, where the closely-related Rawang live; to the north is the Tibetan Autonomous Region. Anong, an autonym, is a...»

«rebels by lewis shiner G u n f i r e a g a i n. His office was in the back of the main building, in what had been the laundry room back when it was a hotel. He was a good half mile from the street, and the rifles sounded like firecrackers. It was the third time this week the guardia had opened up on demonstrators, nothing but warning shots so far, but the thought of it still made Thomas a little sick. Two days ago one of the kids, running away, had tried to climb the project fence and gotten...»

«Internet Engineering Task Force (IETF) J. Snell Request for Comments: 7240 June 2014 Category: Standards Track ISSN: 2070-1721 Prefer Header for HTTP Abstract This specification defines an HTTP header field that can be used by a client to request that certain behaviors be employed by a server while processing a request. Status of This Memo This is an Internet Standards Track document. This document is a product of the Internet Engineering Task Force (IETF). It represents the consensus of the...»

«Sexual and Relationship Therapy^ Vol. 17, No. 4, 2002 BrunnerRoutledge^heSths'dentts Sexual obsessions and OCD WILUAM M. GORDON 224 Lorraine Avenue, Montclair, NJ 07043, USA Abstract Sexual obsessions are common symptoms of obsessive-compulsive disorder (OCD). The literal content of these obsessionssuperficially resembles other types of iterative sexual ideation, as seen in the paraphUias, PTSD, and normal sexualfantasy. However, their form, function, and effect on behavior vary greatly. A...»

«February 2, 2012 University of British Columbia 8:30 a.m. to 2:30 p.m. BOARD OF GOVERNORS UBC Vancouver Arbutus Room MINUTES Ponderosa Centre In Attendance: Board Members Administration Chancellor Sarah Morgan-Silvester Ms. Lisa Castle Mr. Bill Levine, Chair Dr. Louise Cowin President Stephen Toope Dr. David Farrar Ms. Theresa Arsenault Mr. Stephen Owen Ms. Shannon Dunn Dr. Doug Owram Ms. Anne-Marie Fenger Mr. Hubert Lai Mr. Robert Fung Ms. Reny Kahlon Dr. Nassif Ghoussoub Mr. Sean Heisler Dr....»

«In J. Gajewski, V. Hacquard, B. Nickel, and S. Yalcin (eds.), New Work on Modality. MIT Working Papers in Linguistics, v. 51.Assessor Sensitivity: Epistemic Modals and Predicates of Personal Taste* Tamina Stephenson Massachusetts Institute of Technology There are a number of parallels between predicates of personal taste (e.g., taste good, be fun) and epistemic modals. In particular, the difficulty in determining whose knowledge or beliefs are expressed by an epistemic modal mirrors the...»

«Restructuring and insolvency briefing October 2009 Debt for equity swaps: an introduction Summary and implications Ask a question If you have any questions please Companies are often looking for ways to strengthen their balance sheet contact Graham Stedman, Partner and reduce their debt. This is particularly the case for companies in T +44 (0)20 7524 6449 financial difficulty. Similarly, where a company is having difficulties g.stedman@nabarro.com meeting its financial commitments, creditors...»

«Traffic Analysis of the HTTP Protocol over TLS George Danezis University of Cambridge Computer Laboratory William Gates Building, JJ Thomson Avenue Cambridge CB3 0FD, United Kingdom George.Danezis@cl.cam.ac.uk Abstract. We analyze attacks that take advantage of the data length information leaked by HTTP transactions over the TLS protocol, in order to link clients with particular resources they might access on a web site. The threat model considered is a public news site that tries to protect...»

«4. Are all non-Ahmadis unbelievers? The full force of the new doctrines taught by M. Mahmud would be felt by a Muslim in the strange announcement according to which all Muslims except the Ahmadis are really non-Muslims. So strange and paradoxical does the announcement — the Muslims being non-Muslims — appear that hardly any body would believe that a sane person could make this statement, but this is the actual consequence of the new doctrine taught by M. Mahmud relating to the prophethood...»





 
<<  HOME   |    CONTACTS
2017 www.thesis.dislib.info - Online materials, documents

Materials of this site are available for review, all rights belong to their respective owners.
If you do not agree with the fact that your material is placed on this site, please, email us, we will within 1-2 business days delete him.